What we build · Garden Apartments

Garden — Cheapest Per Unit, Hungriest for Land

Two to three story wood frame with surface parking. The cheapest way to build a unit in Florida, and it only works where land is cheap enough to spread out.

Bring the site, the unit count and the drawings at whatever stage. You get a range, the drivers, and an honest read on the pro forma.

Self-perform

Dewatering, SOE and deep foundations in house

Licensed

General contractor, licensed in the state of Florida

GMP

Open book, with the contingency visible to you

Draws

Documentation your lender can actually process

The land does the deciding

Garden product is efficient to build and inefficient with land. Surface parking at typical Florida ratios consumes an enormous share of the site, so the typology only pencils where land cost per unit stays low. When land moves, garden stops working long before construction cost becomes the issue.

The horizontal cost is the part that moves most between sites. Two garden schemes with identical unit counts can differ substantially in what it costs to get roads, utilities, drainage and stormwater across the site, and that difference frequently exceeds anything available in the buildings themselves.

What drives cost here

  • Wood frame, which is the cheapest structural system available.
  • Surface parking — cheap to build, expensive in land consumed.
  • Horizontal infrastructure: roads, utilities, drainage across a large site.
  • Florida stormwater retention, which takes real acreage.
  • Repetition, which is where the savings actually come from.

Why phasing changes the return

Garden product delivers in discrete buildings, which means the first ones can be leased while the rest are still going up. Six months of earlier lease-up on a third of the units is a material improvement to the return and it costs almost nothing to plan for at the start.

What it does require is that the site work, the amenity and the access are sequenced so an early building is genuinely occupiable rather than sitting finished in the middle of an active site.

How we handle it

  1. 01Test the site yield honestly before the pro forma hardens.
  2. 02Price the horizontal work properly — it is frequently underestimated.
  3. 03Value engineer through repetition rather than through specification.
  4. 04Build in phases so lease-up can start before completion.
  5. 05Coordinate stormwater and utilities early, since they gate everything.

Phase it so the first buildings deliver while the rest are still going up. Lease-up starting six months earlier changes the return materially, and it costs almost nothing to plan for at the start and a great deal to retrofit later.

Said plainly

Where we stop

If the land basis is high, garden will not pencil no matter how efficiently we build it. We will tell you that at the site-test stage rather than after a full design.

FAQ

Common questions

Is wood frame allowed in Florida?
Yes, within height and type limits, and with wind requirements that are stricter than most of the country.
How many parking spaces per unit?
Jurisdiction dependent, and it drives site yield more than almost anything else.
Can we phase it?
Yes, and you should. Early lease-up changes the return significantly.
What gets underestimated most?
The horizontal work — roads, utilities, drainage and stormwater across a spread-out site.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.