What we build · Garden Apartments
Garden — Cheapest Per Unit, Hungriest for Land
Two to three story wood frame with surface parking. The cheapest way to build a unit in Florida, and it only works where land is cheap enough to spread out.
Bring the site, the unit count and the drawings at whatever stage. You get a range, the drivers, and an honest read on the pro forma.
Self-perform
Dewatering, SOE and deep foundations in house
Licensed
General contractor, licensed in the state of Florida
GMP
Open book, with the contingency visible to you
Draws
Documentation your lender can actually process
The land does the deciding
Garden product is efficient to build and inefficient with land. Surface parking at typical Florida ratios consumes an enormous share of the site, so the typology only pencils where land cost per unit stays low. When land moves, garden stops working long before construction cost becomes the issue.
The horizontal cost is the part that moves most between sites. Two garden schemes with identical unit counts can differ substantially in what it costs to get roads, utilities, drainage and stormwater across the site, and that difference frequently exceeds anything available in the buildings themselves.
What drives cost here
- Wood frame, which is the cheapest structural system available.
- Surface parking — cheap to build, expensive in land consumed.
- Horizontal infrastructure: roads, utilities, drainage across a large site.
- Florida stormwater retention, which takes real acreage.
- Repetition, which is where the savings actually come from.
Why phasing changes the return
Garden product delivers in discrete buildings, which means the first ones can be leased while the rest are still going up. Six months of earlier lease-up on a third of the units is a material improvement to the return and it costs almost nothing to plan for at the start.
What it does require is that the site work, the amenity and the access are sequenced so an early building is genuinely occupiable rather than sitting finished in the middle of an active site.
How we handle it
- 01Test the site yield honestly before the pro forma hardens.
- 02Price the horizontal work properly — it is frequently underestimated.
- 03Value engineer through repetition rather than through specification.
- 04Build in phases so lease-up can start before completion.
- 05Coordinate stormwater and utilities early, since they gate everything.
Phase it so the first buildings deliver while the rest are still going up. Lease-up starting six months earlier changes the return materially, and it costs almost nothing to plan for at the start and a great deal to retrofit later.
Said plainly
Where we stop
If the land basis is high, garden will not pencil no matter how efficiently we build it. We will tell you that at the site-test stage rather than after a full design.
FAQ
Common questions
- Is wood frame allowed in Florida?
- Yes, within height and type limits, and with wind requirements that are stricter than most of the country.
- How many parking spaces per unit?
- Jurisdiction dependent, and it drives site yield more than almost anything else.
- Can we phase it?
- Yes, and you should. Early lease-up changes the return significantly.
- What gets underestimated most?
- The horizontal work — roads, utilities, drainage and stormwater across a spread-out site.
The terms
GMP & Contract Structure
A guaranteed maximum price is the standard structure for multifamily, and how it is assembled matters more than the number on the front.
Read more →
Lender Draws
Your lender is a stakeholder in the program whether or not anyone treats them as one. A draw that gets rejected costs you a month of carry.
Read more →
Contingency
Contingency is not padding and it is not free money. It is a bounded provision for things nobody could reasonably have known, and it should be governed as such.
Read more →
Schedule Risk
On a multifamily deal a month of delay costs carry plus a month of deferred lease-up, and that combination is usually larger than any construction saving anyone negotiated.
Read more →
Material Escalation
Between pricing and buying, materials move. Somebody carries that, and the contract should say who rather than leaving it to be argued.
Read more →
More what we build
Wrap & Texas Donut
Residential wrapped around a freestanding parking structure. More density than garden without the cost of building over the parking.
Read more →
Podium
Concrete parking and ground-floor uses below, wood-framed residential above. The workhorse of urban multifamily, and the typology where Florida ground conditions bite hardest.
Read more →
Mid-Rise Concrete
Cast-in-place or precast concrete throughout. More expensive per square foot than wood and often the right answer anyway — particularly near the water.
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.